Industrial Stormwater Sampling Basics

Industrial Stormwater Sampling Basics

Industrial stormwater sampling is used to understand what leaves a facility during qualifying storm events. A good program connects the monitoring goal, sample location, rainfall trigger, discharge point, field procedure, and documentation.

What to plan before sampling

  • Identify drainage areas and discharge points.
  • Confirm sample locations are safe and representative.
  • Prepare bottles, labels, field meters, and chain-of-custody forms.
  • Track rainfall start time, sample time, flow conditions, and visual observations.
  • Keep records of BMP conditions and corrective actions.

Equipment considerations

Manual grab sampling may work for accessible outfalls. Automatic samplers can help where timing, safety, access, or composite sampling requirements make manual sampling difficult.

Related resources

Need a stormwater compliance starting point?

Review the compliance hub, compare monitoring equipment, and use the related calculators for early screening and planning.

Open compliance guideRequest equipment help