Detention Routing Visual Calculator
Use this visual calculator to explore how inflow hydrographs, basin storage, orifice controls, and weirs affect peak outflow, peak stage, storage use, and drawdown time.
What it shows
Live hydrograph routing, basin stage, outlet response, storage use, peak flow reduction, and drawdown behavior.
Best use
Learning, early planning, detention basin discussions, HMP concepts, and no-net-increase flow mitigation education.
Not a final design model
Confirm final designs using agency criteria, full hydrologic models, survey data, and professional engineering judgment.
[wwfw_visual_detention_routing_calculator]
How to use this visual calculator
Start with the peak inflow and storm duration, then adjust basin storage and outlet controls. Watch how the inflow hydrograph is attenuated into a smaller and delayed outflow hydrograph. A smaller outlet usually reduces peak outflow but increases peak stage and storage use. A larger outlet lowers stage but may provide less mitigation.
Inputs explained
- Peak inflow: the maximum inflow rate entering the basin.
- Storm duration: the assumed duration of the simplified triangular inflow hydrograph.
- Basin bottom area and side storage factor: simplified inputs used to create a stage-storage relationship.
- Maximum basin depth: planning depth used to check storage exceedance and freeboard concerns.
- Orifice diameter and invert: lower outlet control that begins discharging when water is above the orifice invert.
- Weir crest and length: overflow or higher-stage outlet control.
Related visual calculators
- Visual Water Engineering Calculators
- Manning Channel Visual Calculator
- Culvert Hydraulics Visual Calculator
- Detention Storage Calculator
Need help checking a detention or HMP calculation?
Use this tool for learning and early planning. For project-specific routing assumptions, basin sizing, or no-net-increase flow mitigation review, send the basic project details.
